Thursday, September 10, 2009

Marlin making mounting

Marlin is pictured here making the mounting rails

Sheet processor

Here we see the sheet cutter, aka the Table Saw of Death being used to do the rough cutting for the ARC solar panels.  This afternoon we'll be doing the fine cutting and then we can start assembling.  Note, this was a two person job, but I was taking the picture.

Solar panel mounting mock up

This is the mock up of how the panels will go on the wall.  The entire system is proving a bit unwieldly, but still workable.  The real challenge is trying to make the spacing and sizing of the panels look like it was all planned to fit around the windows and in the spaces provided.

Friday, September 4, 2009

Our cousins down south

This video is a succinct statement of many of the same goals we have.
http://www.youtube.com/watch?v=_ozX_nt5A4o

In order to accomplish the same goals up in our much colder climate, we
have to do a few things differently. I would really enjoy a road trip
down there for a visit and some knowledge sharing, though.

Thursday, September 3, 2009

Started up the Solar Heat Storage

Today I started up the West half of the solar panels. The heat is going
in to the bottom half that is currently about 60. My goal is to see it
hit 80 to 85 down there by the end of October. Warm days and low autumn
sun should help. Now I just need to remember to check the filters.

The East half will be fired up next week after we replace the filters
and add foam stoppers on the upper half of the heat storage tubes.

Thursday, August 20, 2009

Gas meter turned pump

Paul is taking apart a gas meter to learn about making low pressure, low volume pump from it.

Saturday, August 15, 2009

Last minutes on Grant

It's Saturday morning and we're just finishing hundreds of hours of work
on a proposal for a DOE grant to work on our solar panels. YAY! It's in!